Warning: Undefined variable $time_difference in /home4/hpvcxhmy/public_html/wp-content/plugins/similarity/similarity.php on line 324

Warning: Undefined array key 0 in /home4/hpvcxhmy/public_html/wp-content/plugins/similarity/similarity.php on line 336

Warning: Undefined variable $time_difference in /home4/hpvcxhmy/public_html/wp-content/plugins/similarity/similarity.php on line 324

Warning: Undefined array key 0 in /home4/hpvcxhmy/public_html/wp-content/plugins/similarity/similarity.php on line 336
Categories
Local politics State

Returning to the MVC


Warning: Undefined variable $time_difference in /home4/hpvcxhmy/public_html/wp-content/plugins/similarity/similarity.php on line 324

Warning: Undefined array key 0 in /home4/hpvcxhmy/public_html/wp-content/plugins/similarity/similarity.php on line 336

Warning: Undefined variable $time_difference in /home4/hpvcxhmy/public_html/wp-content/plugins/similarity/similarity.php on line 324

Warning: Undefined array key 0 in /home4/hpvcxhmy/public_html/wp-content/plugins/similarity/similarity.php on line 336

Things have been somewhat quiet on the MountainView Corridor issue until just before they released their Draft Environmental Impact Statement (EIS). As soon as it was out I went to take a look at what the draft EIS said. For those who have been interested in the issue before there is nothing particularly surprising (from what I have seen so far – I’m not sure I’ll ever read all the pages in this 5 volume report).

I just wanted to put a link to the actual report in case anyone is interested in more than the newspaper analysis (actually there’s no analysis so far, just reports of the release) of what is in the draft EIS. I am encouraged by the statements within the EIS explaining the efforts of Lehi city to propose a better plan, and specifically the acknowledgment that the Federal Highway Administration (FHWA) has not identified a preferred alternative and that UDOT and FHWA are considering the necessity of releasing a supplemental EIS once they have had a chance to more carefully study the 4800 N freeway alternative proposed by Lehi city.

I plan to use this public comment period to voice my position to UDOT, but also to encourage discussion of the issue here – I’d love to hear what others think about this plan.

By David

David is the father of 8 children. When he's not busy with that full time occupation he works as a technology professional. He enjoys discussing big issues with informed people, cooking, gardening, vexillology (flag design), and tinkering.